Boiler Controls Study
Exxon-Mobil Production / King Ranch Boiler Controls Study
Wilson-Mohr’s scope of supply was defined as the feasibility study and functional specification development for the retrofit of the combustion and burner management control systems for five industrial boilers at this gas production site. Project interfaces included the plant operations and maintenance staffs, plant engineering and corporate engineering. The scope of the functional specification included the hardware, software, building expansion and logic development for the boiler control systems.

Projects