Burner Management

Home | Projects | Success Stories | Burner Management

Premcor Port Author :: Waste Heat Boiler/Burner Management System

Building on Wilson-Mohr’s heritage of safety shutdown system supply, our scope of supply included the Fault Tolerant Controller-based burner management systems for two waste heat auxiliary boilers. System interfaces included serial and hardwired interfaces to plant-wide DCS and local light-off panels.

The project management scope included coordination of the FTC hardware vendor, safety integrated system (SIS) auditor, construction contractor and Premcor’s project management team.